Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address:
922 S 4TH AV
Address NEW:
922 S 4TH AV
Apply Date:
07/04/2024
Applicant:
TFS Solar
Description:
Roof mount 6.45kW DC photovoltaic solar system; 15 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings, 60A breaker; 225A bus with 200A MCB, Tesla Backup Switch. REV 1: Relocated SES and PV related equipment. Added a Tesla battery expansion pack. 11.5kWh Storage. REV2: Removed Powerwall-3 Expansion Unit from scope of work. (future battery expansion).

Permit Reviews

Permit Number - TC-RES-0724-03943
Permit Status: Issued
Permit Description: Roof mount 6.45kW DC photovoltaic solar system; 15 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings, 60A breaker; 225A bus with 200A MCB, Tesla Backup Switch. REV 1: Relocated SES and PV related equipment. Added a Tesla battery expansion pack. 11.5kWh Storage. REV2: Removed Powerwall-3 Expansion Unit from scope of work. (future battery expansion).
Start Date Submittal Complete Date Status  
02/06/2025 RESIDENTIAL SOLAR REVISION v.1 03/12/2025 APPROVED Review Details
10/31/2024 RESIDENTIAL SOLAR v.1 11/27/2024 APPROVED Review Details
07/08/2024 RESIDENTIAL SOLAR v.1 08/07/2024 APPROVED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0724-03943
Permit Description: Roof mount 6.45kW DC photovoltaic solar system; 15 modules; 14 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings, 60A breaker; 225A bus with 200A MCB, Tesla Backup Switch. REV 1: Relocated SES and PV related equipment. Added a Tesla battery expansion pack. 11.5kWh Storage. REV2: Removed Powerwall-3 Expansion Unit from scope of work. (future battery expansion).
Total Completed Inspections - 5
Date Description Inspector Results Comments
01/27/2025 COT - RSOL - Electrical Underground Solar Project Passed Approved underground solar and electrical conduits from equipment and service location to the home, okay to backfill progress areas
02/20/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
02/20/2025 RSBU - Building Final Passed
02/20/2025 COT - RSOL - Electrical Final Solar Project Passed
02/20/2025 BULD - Electrical Clearance Passed Approved solar with powerwall 3 - DGC/BAT clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV2 VERGE JOSPEH PV 6.45KW STORAGE 27KWH - DRAWINGS_V1.PDF DOCUMENTS VIEW
REV2 VERGE JOSEPH PERMIT REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV1 VERGE JOSPEH PV 6.45KW STORAGE 27KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
REV1 VERGE JOSEPH PV 6.45KW STORAGE 27KWH-SPECS_V1.PDF DOCUMENTS VIEW
VERGE JOSEPH PV 6.45KW STORAGE 27KWH - REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-VERGE JOSEPH PV 6.45KW STORAGE 14KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
VERGE JOSEPH PV 6.45KW STORAGE 14KWH-SPECS_V1.PDF DOCUMENTS VIEW