Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
1006 S 3RD AV
Address NEW:
1006 S 3RD AV
Apply Date:
07/26/2023
Applicant:
Carlos Brown
Description:
SFR

Permit Reviews

Permit Number - TC-RES-0723-06806
Permit Status: Complete
Permit Description: SFR
Start Date Submittal Complete Date Status  
12/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/26/2023 REQUIRES RESUBMIT Review Details
08/03/2023 RESIDENTIAL NEW DWELLING v.1 08/10/2023 APPROVED Review Details
08/23/2023 RESIDENTIAL NEW DWELLING v.1 08/23/2023 REQUIRES RESUBMIT Review Details
12/27/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/27/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0723-06806
Permit Status: Complete
Permit Description: SFR
Date Description Comments
08/10/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/10/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0723-06806
Permit Description: SFR
Total Completed Inspections - 16
Date Description Inspector Results Comments
08/23/2023 COT - RSPL - Rough Soil Passed
08/25/2023 COT - RSBU - Preslab Passed
08/25/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/01/2023 COT - RSBU - Roof Nailing Passed
09/01/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/01/2023 COT - RSEL - Grounding/Bonding Passed
09/18/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/18/2023 BULD - Electrical Clearance Passed 9/18/23: ECO TEP Clearance
11/28/2023 COT - RSPL - Sewer Passed Okay to back fill. Shading is required. 11/28/2023
11/28/2023 COT - RSPL - Yard Water Line Passed Okay to back fill. Shading is required. 11/28/2023
12/21/2023 RSBU - Building Final Passed
12/21/2023 COT - RSEL - Electrical Final Passed
12/21/2023 COT - RSEL - Electrical Underground Passed
12/21/2023 COT - RSEL - Outdoor Lighting Passed
12/21/2023 COT - RSME - Mechanical Final Passed
12/21/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
1006 S. 3RD AVE MANUAL_V1.PDF DOCUMENTS VIEW
LAYOUT _V1.PDF DOCUMENTS VIEW
MODEL 1350-LAYOUT_V2.PDF DOCUMENTS VIEW
TRUSS CALC _V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3BDRCARLOS_V1.PDF DOCUMENTS VIEW