Permit: TC-RES-0723-06778
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
7333 E 34TH ST
Address NEW:
7333 E 34TH ST
Apply Date:
07/24/2023
Applicant:
Alex Villanueva
Description:
Installation of solar panels on roof of residential home with a main panel upgrade. 11.6KW DC/ 10.0KW AC 29 modules
Permit Reviews
Permit Number - TC-RES-0723-06778
Permit Status: Complete
Permit Description: Installation of solar panels on roof of residential home with a main panel upgrade.
11.6KW DC/ 10.0KW AC
29 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/25/2023 | RESIDENTIAL SOLAR v.1 | 08/17/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06778
Permite Description: Installation of solar panels on roof of residential home with a main panel upgrade.
11.6KW DC/ 10.0KW AC
29 modules
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the service upgrade, INCR Clearance was called into TEP at 11:40 am (power kill) |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06778
Permit Description: Installation of solar panels on roof of residential home with a main panel upgrade.
11.6KW DC/ 10.0KW AC
29 modules
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/29/2023 | BULD - Electrical Clearance | Passed | Approved DGC Clearance to TEP is required for the solar meter | |
| 09/29/2023 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 09/29/2023 | RSBU - Building Final | Passed |