Permit: TC-RES-0723-06770
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
2108 S CAMINO SECO
Address NEW:
2108 S CAMINO SECO
Apply Date:
07/24/2023
Applicant:
Ken Larison
Description:
New Pool & Spa for the Smith Residence
Permit Reviews
Permit Number - TC-RES-0723-06770
Permit Status: Issued
Permit Description: New Pool & Spa for the Smith Residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/24/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/25/2023 | APPROVED |
| 08/02/2023 | RESIDENTIAL NEW DWELLING v.1 | 08/02/2023 | REQUIRES RESUBMIT |
| 11/15/2023 | RESIDENTIAL NEW DWELLING v.2 | 11/15/2023 | APPROVED |
| 11/13/2023 | RESIDENTIAL NEW DWELLING v.1 | 11/13/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0723-06770
Permit Status: Issued
Permit Description: New Pool & Spa for the Smith Residence
| Date | Description | Comments |
|---|---|---|
| 08/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0723-06770
Permite Description: New Pool & Spa for the Smith Residence
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2023 | Pool/Spa - Plumbing | N/A | Partial Pass | Ok to cover |
| 11/17/2023 | Pool/Spa - Electric | N/A | Partial Pass | Ok to cover |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0723-06770
Permit Description: New Pool & Spa for the Smith Residence
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/17/2023 | Pool/Spa - Bonding Grip | Passed | ||
| 11/17/2023 | Pool/Spa - Pre-Gunite | Passed | ||
| 03/18/2024 | RSEL - Electrical Progress | Passed | Electrical work for pool lighting and equipment is complete. | |
| 03/18/2024 | RSBU - Building Final | Passed | Pool equipment is properly installed, equipment control box is secured to exterior wall of house, GFCI breaker and outlet are installed. Okay to proceed with Pebble Tech coating. | |
| 03/18/2024 | Pool/Spa - Final/Barrier | Passed | All doors leading out into the pool area are alarmed. Exterior front and rear gates have spring self closers on them with self latching gate locks. | |
| 03/18/2024 | COT - RSEL - Electrical Final | Passed | Pool equipment is properly installed, equipment control box is secured to exterior wall of house, GFCI breaker and outlet are installed. Okay to proceed with Pebble Tech coating. | |
| 03/18/2024 | COT - BULD - SWG Clearance | Passed | Gas pipe is installed from meter to pool heater and holding 15 pounds of air pressure. Okay to connect pool heater to gas meter. |