Permit: TC-RES-0723-06627
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2531 E 20TH ST
Address NEW:
2531 E 20TH ST
Apply Date:
07/18/2023
Applicant:
Hailey McGraw
Description:
ROOF MOUNTED PV SYSTEM 3.42KW DC/ 8.80KW AC 9 modules
Permit Reviews
Permit Number - TC-RES-0723-06627
Permit Status: Complete
Permit Description: ROOF MOUNTED PV SYSTEM
3.42KW DC/ 8.80KW AC
9 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/28/2023 | RESIDENTIAL SOLAR v.1 | 12/06/2023 | APPROVED |
| 07/19/2023 | RESIDENTIAL SOLAR v.1 | 08/11/2023 | APPROVED |
| 10/30/2023 | RESIDENTIAL SOLAR v.1 | 11/16/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0723-06627
Permit Status: Complete
Permit Description: ROOF MOUNTED PV SYSTEM
3.42KW DC/ 8.80KW AC
9 modules
| Date | Description | Comments |
|---|---|---|
| 11/20/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06627
Permite Description: ROOF MOUNTED PV SYSTEM
3.42KW DC/ 8.80KW AC
9 modules
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2023 | BULD - Electrical Clearance | N/A | Canceled | Cancelled per contractor. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0723-06627
Permit Description: ROOF MOUNTED PV SYSTEM
3.42KW DC/ 8.80KW AC
9 modules
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2024 | RSBU - Building Final | Passed | ||
| 02/13/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 02/13/2024 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter |