Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
668 S MAIN AV
Address NEW:
668 S MAIN AV
Apply Date:
06/11/2026
Applicant:
Inty Ops
Description:
Installation of a 11.50 KW (AC) PV System with battery integrated

Permit Reviews

Permit Number - TC-RES-0626-03113
Permit Status: Complete
Permit Description: Installation of a 11.50 KW (AC) PV System with battery integrated
Start Date Submittal Complete Date Status  
07/22/2026 RESIDENTIAL SOLAR v.2 07/31/2026 APPROVED Review Details
06/11/2026 RESIDENTIAL SOLAR v.1 06/24/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0626-03113
Permit Status: Complete
Permit Description: Installation of a 11.50 KW (AC) PV System with battery integrated
Date Description Comments
06/11/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0626-03113
Permit Description: Installation of a 11.50 KW (AC) PV System with battery integrated
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/01/2026 COT - RSOL - Electrical Final Solar Project Passed
09/01/2026 RSBU - Building Final Passed
09/01/2026 BULD - Electrical Clearance Passed Verbal clearance to TEP DGL. (Tesla backup switch)
Final completed same day. Clearances for TEP DGC/DGL/BAT 9/1/2026