Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3604 N VINE AV
Address NEW:
3604 N VINE AV
Apply Date:
06/26/2025
Applicant:
TFS Solar
Description:
Roof mount 7.40 kW DC photovoltaic solar system; 17 modules; 13.50 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch with whole home backup

Permit Reviews

Permit Number - TC-RES-0625-03238
Permit Status: Complete
Permit Description: Roof mount 7.40 kW DC photovoltaic solar system; 17 modules; 13.50 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch with whole home backup
Start Date Submittal Complete Date Status  
06/26/2025 RESIDENTIAL SOLAR v.1 07/28/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-03238
Permite Description: Roof mount 7.40 kW DC photovoltaic solar system; 17 modules; 13.50 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch with whole home backup
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/10/2025 COT - BULD - SWG Clearance N/A Not Applicable N/A

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-03238
Permit Description: Roof mount 7.40 kW DC photovoltaic solar system; 17 modules; 13.50 kWh Storage, 1 Tesla Powerwall-3 battery with integrated PV inverter with 2 strings; 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch with whole home backup
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/10/2025 COT - RSOL - Electrical Final Solar Project Passed
09/10/2025 BULD - Electrical Clearance Passed 9/10/25
TEP CLEARANCE: DGC/DGL/BAT, Called TEP @ 10:04 am for Tesla switch.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BERGER ARTHUR PV2 7.40KW STORAGE 13.5KWH-SPECS_V1.PDF DOCUMENTS VIEW
CONS-BERGER ARTHUR PV2 7.40KW STORAGE 13.5KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW