Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/23/2025
Applicant:
Katherine Stender
Description:
Convert Garage into Guest House - ADU

Permit Reviews

Permit Number - TC-RES-0625-03181
Permit Status: Issued
Permit Description: Convert Garage into Guest House - ADU
Start Date Submittal Complete Date Status  
09/08/2025 RESIDENTIAL NEW DWELLING v.2 09/08/2025 REQUIRES RESUBMIT Review Details
07/30/2026 RESIDENTIAL NEW DWELLING v.5 08/13/2026 APPROVED Review Details
07/08/2026 RESIDENTIAL NEW DWELLING v.3 N/A REQUIRES RESUBMIT Review Details
06/25/2025 RESIDENTIAL NEW DWELLING v.1 07/25/2025 REQUIRES RESUBMIT Review Details
07/15/2026 RESIDENTIAL NEW DWELLING v.4 07/24/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0625-03181
Permit Status: Issued
Permit Description: Convert Garage into Guest House - ADU
Total Outstanding Activity Conditions - 2
Date Name
07/24/2026 Prior to Inspections - Required Documents - An intermediate Elevation Certificate is required PRIOR TO PRE-SLAB INSPECTION.
11/10/2025 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.

Conditions

Permit Number - TC-RES-0625-03181
Permit Status: Issued
Permit Description: Convert Garage into Guest House - ADU
Date Description Comments
07/16/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
06/25/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/24/2026 Parcel is located within a regulatory floodplain. Engineering review required prior to issuance, floodplain use permit TE-FPU-0925-00346 must be paid.

Documents

File Name Document Type  
2_RESPONSE LETTER-2026-07-27_V2.PDF DOCUMENTS VIEW
3_C.O.T. PLAN REVIEW COMMENTS 07-08-26_V3.PDF DOCUMENTS VIEW
CONS-3_PLAN SET-3950-DESMOND-LN_V3.PDF DOCUMENTS VIEW
MANUAL J-2_MECHANICAL ENGERY CALC (HLHG)_V2.PDF DOCUMENTS VIEW