Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/22/2025
Applicant:
Adam Carda
Description:
Remove and Replace Electrical Sub-Panel. 200A Sub-panel, replace with 200A Sub-panel. Includes: Circuit Labeling, Panel Replacement, Rewiring

Permit Reviews

Permit Number - TC-RES-0625-03155
Permit Status: Complete
Permit Description: Remove and Replace Electrical Sub-Panel. 200A Sub-panel, replace with 200A Sub-panel. Includes: Circuit Labeling, Panel Replacement, Rewiring
Start Date Submittal Complete Date Status  
07/01/2025 RESIDENTIAL SIMPLE REVIEW v.3 07/01/2025 APPROVED Review Details
06/23/2025 RESIDENTIAL SIMPLE REVIEW v.1 06/23/2025 REQUIRES RESUBMIT Review Details
06/26/2025 RESIDENTIAL SIMPLE REVIEW v.2 06/26/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0625-03155
Permit Status: Complete
Permit Description: Remove and Replace Electrical Sub-Panel. 200A Sub-panel, replace with 200A Sub-panel. Includes: Circuit Labeling, Panel Replacement, Rewiring
Date Description Comments
06/23/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-03155
Permit Description: Remove and Replace Electrical Sub-Panel. 200A Sub-panel, replace with 200A Sub-panel. Includes: Circuit Labeling, Panel Replacement, Rewiring
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/03/2025 RSBU - Building Final Passed 7.3.25
Sub Panel is installed according to plans. Proper conductors used. Lugs torqued to spec. Panel schedule present. dead front has no open spaces uncovered other than those for existing breakers. INCR CLEARANCE TO TEP.
07/03/2025 COT - RSEL - Electrical Final Passed 7.3.25
Sub Panel is installed according to plans. Proper conductors used. Lugs torqued to spec. Panel schedule present. dead front has no open spaces uncovered other than those for existing breakers. INCR CLEARANCE TO TEP.
07/03/2025 BULD - Electrical Clearance Passed 7.3.25
Sub Panel is installed according to plans. Proper conductors used. Lugs torqued to spec. Panel schedule present. dead front has no open spaces uncovered other than those for existing breakers. INCR CLEARANCE TO TEP.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PLAN_V3.PDF DOCUMENTS VIEW