Permit: TC-RES-0625-03020
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6648 E 17TH ST
Address NEW:
6648 E 17TH ST
Apply Date:
06/13/2025
Applicant:
Micheal Weber
Description:
replace gas line from meter to house and into mechanical closet
Permit Reviews
Permit Number - TC-RES-0625-03020
Permit Status: Complete
Permit Description: replace gas line from meter to house and into mechanical closet
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/13/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 06/16/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0625-03020
Permit Status: Complete
Permit Description: replace gas line from meter to house and into mechanical closet
| Date | Description | Comments |
|---|---|---|
| 06/16/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 06/13/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0625-03020
Permit Description: replace gas line from meter to house and into mechanical closet
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/17/2025 | COT - BULD - SWG Clearance | Passed | Approved gas piping and pressure test - SWG Clearance is required for reconnection | |
| 06/17/2025 | RSBU - Building Final | Passed | Approved gas piping and pressure test - SWG Clearance is required for reconnection |