Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/12/2025
Applicant:
Marytine Ramos
Description:
Installation of a 4.10kw Roof Mount PV System (Main home) with Battery and 225A MPU

Permit Reviews

Permit Number - TC-RES-0625-02994
Permit Status: Complete
Permit Description: Installation of a 4.10kw Roof Mount PV System (Main home) with Battery and 225A MPU
Start Date Submittal Complete Date Status  
08/08/2025 RESIDENTIAL SOLAR v.2 08/08/2025 REQUIRES RESUBMIT Review Details
08/11/2025 RESTAMP - RESIDENTIAL v.1 08/12/2025 APPROVED Review Details
08/11/2025 RESIDENTIAL SOLAR v.3 08/11/2025 APPROVED Review Details
06/12/2025 RESIDENTIAL SOLAR v.1 08/06/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0625-02994
Permit Status: Complete
Permit Description: Installation of a 4.10kw Roof Mount PV System (Main home) with Battery and 225A MPU
Date Description Comments
07/11/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-02994
Permite Description: Installation of a 4.10kw Roof Mount PV System (Main home) with Battery and 225A MPU
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/25/2025 BULD - Electrical Clearance N/A Canceled needed unit 1

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-02994
Permit Description: Installation of a 4.10kw Roof Mount PV System (Main home) with Battery and 225A MPU
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/03/2025 BULD - Electrical Clearance Passed 12.03.2025
Clearance TEP DGC/BAT.
12/03/2025 COT - RSOL - Electrical Final Solar Project Passed
12/03/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PLANS - SHANE REISER - 4.1 KW_V2.PDF DOCUMENTS VIEW