Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
2550 W SAN JUAN TE
Apply Date:
06/09/2025
Applicant:
Emmanuel Ledezma
Description:
REV_1, Add utility pole and 400 AMP panel; SFR

Permit Reviews

Permit Number - TC-RES-0625-02964
Permit Status: Issued
Permit Description: REV_1, Add utility pole and 400 AMP panel; SFR
Start Date Submittal Complete Date Status  
06/11/2025 RESIDENTIAL NEW DWELLING v.1 07/10/2025 REQUIRES RESUBMIT Review Details
10/22/2025 RESIDENTIAL NEW DWELLING REVISION v.1 10/22/2025 REQUIRES RESUBMIT Review Details
07/15/2025 RESIDENTIAL NEW DWELLING v.2 08/04/2025 APPROVED Review Details
08/04/2025 RESTAMP - RESIDENTIAL v.1 08/05/2025 APPROVED Review Details
11/13/2025 RESIDENTIAL NEW DWELLING REVISION v.2 11/24/2025 APPROVED Review Details
10/07/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/07/2025 REQUIRES RESUBMIT Review Details
10/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/16/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-RES-0625-02964
Permit Status: Issued
Permit Description: REV_1, Add utility pole and 400 AMP panel; SFR
Total Outstanding Activity Conditions - 2
Date Name
07/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/04/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.

Conditions

Permit Number - TC-RES-0625-02964
Permit Status: Issued
Permit Description: REV_1, Add utility pole and 400 AMP panel; SFR
Date Description Comments
06/11/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/11/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
07/07/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0625-02964
Permite Description: REV_1, Add utility pole and 400 AMP panel; SFR
Total Outstanding Inspections - 2

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0625-02964
Permit Description: REV_1, Add utility pole and 400 AMP panel; SFR
Total Completed Inspections - 10
Date Description Inspector Results Comments
09/08/2025 COT - RSPL - Rough Soil Passed
09/12/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 9/12/25
09/12/2025 COT - RSBU - Preslab Passed Passed 9/12/25
09/26/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 9/26/25
09/26/2025 COT - RSBU - Roof Nailing Passed Passed 9/26/25
10/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed OK to insulate and sheet rock throughout.
10/23/2025 COT - RSPL - Yard Water Line Passed Ok to cover progress area
10/23/2025 COT - RSEL - Electrical Underground Passed Conduit for 400 amp service in place. OK to cover progress,area.
10/29/2025 COT - RSPL - Sewer Passed OK to cover progress areas.
12/04/2025 BULD - Electrical Clearance Passed Passed 12/4/25 CLEARANCE ECO

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RANGEL REVISED SITE PLAN 9-10-25 (1)_V2.PDF DOCUMENTS VIEW
ELECTRIC BOX_V1_V2.PDF DOCUMENTS VIEW
RANGEL REVISED ELECTRICAL PLAN 9-10-25 (1)_V1.PDF DOCUMENTS VIEW
R90004478.J2503351A_V2.PDF DOCUMENTS VIEW
RANGEL PRIVATE RESIDENCE LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RANGEL COMMENT RESPONSE SET_V1.PDF DOCUMENTS VIEW