Permit: TC-RES-0625-02939
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2708 E VIA ROTUNDA
Address NEW:
2708 E VIA ROTUNDA
Apply Date:
06/08/2025
Applicant:
Devon Hughes
Description:
Electrical panel 200 amp upgrade with 18KW Generac generator and automatic transfer switch
Permit Reviews
Permit Number - TC-RES-0625-02939
Permit Status: Complete
Permit Description: Electrical panel 200 amp upgrade with
18KW Generac generator and automatic
transfer switch
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/09/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 06/10/2025 | REQUIRES RESUBMIT |
| 06/17/2025 | RESIDENTIAL SIMPLE REVIEW v.2 | 06/17/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0625-02939
Permit Status: Complete
Permit Description: Electrical panel 200 amp upgrade with
18KW Generac generator and automatic
transfer switch
| Date | Description | Comments |
|---|---|---|
| 06/09/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0625-02939
Permit Description: Electrical panel 200 amp upgrade with
18KW Generac generator and automatic
transfer switch
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2025 | COT - RSEL - Electrical Underground | Passed | 10.3.2025 Verified per plan. 2" schedule 40 conduit underground running 60ft for transfer switch to house. Okay to backfill with shading materials. |
|
| 10/03/2025 | BULD - Electrical Clearance | Passed | 10.3.2025 Clearance to TEP INCR for 200A MPU cutover. |
|
| 10/23/2025 | COT - BULD - SWG Clearance | Passed | Pressure verified Tracer verified Depth verified Approved |
|
| 04/21/2026 | COT - RSEL - Electrical Final | Passed | ||
| 04/21/2026 | COT - RSPL - Plumbing Final | Passed |