Permit: TC-RES-0625-02884
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2162 E EDISON ST
Address NEW:
2162 E EDISON ST
Apply Date:
06/04/2025
Applicant:
TFS Solar
Description:
Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0625-02884
Permit Status: Complete
Permit Description: Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2025 | RESTAMP - RESIDENTIAL v.1 | 07/01/2025 | APPROVED |
| 07/01/2025 | RESIDENTIAL SOLAR v.2 | 07/01/2025 | APPROVED |
| 06/04/2025 | RESIDENTIAL SOLAR v.1 | 07/01/2025 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0625-02884
Permite Description: Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2025 | COT - RSOL - Electrical Progress Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0625-02884
Permit Description: Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2025 | BULD - Electrical Clearance | Passed | Approved added solar panels to existing - DGC Clearance to TEP is required | |
| 07/23/2025 | COT - RSOL - Electrical Final Solar Project | Passed |