Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2162 E EDISON ST
Address NEW:
2162 E EDISON ST
Apply Date:
06/04/2025
Applicant:
TFS Solar
Description:
Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB

Permit Reviews

Permit Number - TC-RES-0625-02884
Permit Status: Complete
Permit Description: Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
Start Date Submittal Complete Date Status  
07/01/2025 RESTAMP - RESIDENTIAL v.1 07/01/2025 APPROVED Review Details
07/01/2025 RESIDENTIAL SOLAR v.2 07/01/2025 APPROVED Review Details
06/04/2025 RESIDENTIAL SOLAR v.1 07/01/2025 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-02884
Permite Description: Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/23/2025 COT - RSOL - Electrical Progress Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-02884
Permit Description: Roof mount 1.3kW DC addition to existing photovoltaic solar system (new total system size: 8.81 kW). 3 additional DC modules with rapid shutdown (1 branch) added to existing 7.6kW inverter. 40A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 2
Date Description Inspector Results Comments
07/23/2025 BULD - Electrical Clearance Passed Approved added solar panels to existing - DGC Clearance to TEP is required
07/23/2025 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SMALL RICHARD PV ADD 1.3KW-RFC DRAWING_V2.PDF DOCUMENTS VIEW
SMALL RICHARD PV ADD 1.3KW - SPECS_V1.PDF DOCUMENTS VIEW