Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
8026 S QUEEN CREEK DR
Apply Date:
06/02/2025
Applicant:
Tim Willsey
Description:
Like for like replacement of meter and disconnect and updating inverters from a 4.2 kW and 6.0 kW Power-One inverters to a 5.0 kW and 5.7 kW Tesla inverters. Updating inverters includes wiring from combiner load center to inverter, proper sized OCPD for each inverter and addition of mid-circuit interrupters (MCIs) to existing stringing.

Permit Reviews

Permit Number - TC-RES-0625-02822
Permit Status: Complete
Permit Description: Like for like replacement of meter and disconnect and updating inverters from a 4.2 kW and 6.0 kW Power-One inverters to a 5.0 kW and 5.7 kW Tesla inverters. Updating inverters includes wiring from combiner load center to inverter, proper sized OCPD for each inverter and addition of mid-circuit interrupters (MCIs) to existing stringing.
Start Date Submittal Complete Date Status  
06/02/2025 RESIDENTIAL SOLAR v.1 06/26/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0625-02822
Permit Status: Complete
Permit Description: Like for like replacement of meter and disconnect and updating inverters from a 4.2 kW and 6.0 kW Power-One inverters to a 5.0 kW and 5.7 kW Tesla inverters. Updating inverters includes wiring from combiner load center to inverter, proper sized OCPD for each inverter and addition of mid-circuit interrupters (MCIs) to existing stringing.
Date Description Comments
06/26/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0625-02822
Permit Description: Like for like replacement of meter and disconnect and updating inverters from a 4.2 kW and 6.0 kW Power-One inverters to a 5.0 kW and 5.7 kW Tesla inverters. Updating inverters includes wiring from combiner load center to inverter, proper sized OCPD for each inverter and addition of mid-circuit interrupters (MCIs) to existing stringing.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/12/2025 BULD - Electrical Clearance Passed 9/12/25
TEP CLEARANCE: DGC
09/12/2025 COT - RSOL - Electrical Final Solar Project Passed
09/12/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-RAY PLANS_V1.PDF DOCUMENTS VIEW