Permit Number - TC-RES-0624-03533
Permit Status: Complete
Permit Description: Individual unit permit
Start Date Submittal Complete Date Status  
06/17/2024 RESIDENTIAL NEW DWELLING v.1 07/23/2024 REQUIRES RESUBMIT Review Details
02/24/2025 RESIDENTIAL NEW DWELLING REVISION v.3 02/27/2025 APPROVED Review Details
09/18/2024 RESIDENTIAL NEW DWELLING v.2 10/18/2024 APPROVED Review Details
01/09/2025 RESIDENTIAL NEW DWELLING REVISION v.1 02/04/2025 REQUIRES RESUBMIT Review Details
02/14/2025 RESIDENTIAL NEW DWELLING REVISION v.2 02/24/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0624-03533
Permit Status: Complete
Permit Description: Individual unit permit
Date Description Comments
06/17/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
11/18/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
10/18/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/01/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/25/2024 Full payment of Impact fees required prior to issue of CofO/LOC
02/27/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/01/2024 Post-Installed Anchor Inspection Report is required.
02/27/2025 Post-Tension Inspection Report is required.
10/01/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0624-03533
Permite Description: Individual unit permit
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/23/2025 COT - RSBU - Stem Wall/Retaining Wall N/A Not Applicable 5-23-25, not applicable.
07/14/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass 7-14-25: verified nailing & straps on exterior sheathing only. Okay to continue construction at progress areas.
07/14/2025 COT - RSBU - Roof Nailing N/A Partial Pass 7-14-25: roof nailing verified per plans-Okay to dry-in roof.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0624-03533
Permit Description: Individual unit permit
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/16/2025 COT - RSPL - Rough Soil Passed 5/16/25: PLUMBING UNDERGROUND PER APPROVED PLANS. PRESSURE TEST APPROVE. SHADING REQUIRED
05/16/2025 COT - RSPL - Sewer Passed 5/16/25: PLUMBING UNDERGROUND PER APPROVED PLANS. PRESSURE TEST APPROVE. SHADING REQUIRED
05/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5-23-25, excavation/reinforcement/setbacks and preslab approved. Okay to pour concrete.
05/23/2025 COT - RSBU - Preslab Passed 5-23-25, excavation/reinforcement/setbacks and preslab approved. Okay to pour concrete.
05/23/2025 COT - RSEL - Electrical Underground Passed 5-23-25, electrical underground approved.
07/09/2025 COT - RSPL - Yard Water Line Passed
09/11/2025 COT - RSEL - Grounding/Bonding Passed 9-11-25: approved.
09/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 9-16-25: exterior clips/sheathing approved.
09/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9-16-25: intermediates approved.
09/16/2025 COT - RSBU - Roof Nailing Passed 9-16-25: approved.
09/16/2025 BULD - Electrical Clearance Passed 9-16-25: okay to energize panel. ECO clearance issued to TEP.
09/18/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed 9-18-25: draft-stop/firewall approved
09/22/2025 COT - RSBU - Interior Shear Bracing Passed 9-22-25: interior shear bracing approved. Okay for tape & texture.
12/04/2025 RSBU - Building Final Passed 12-4-25: electrical, mechanical, plumbing, outdoor lighting, building final approved.
12/04/2025 COT - RSEL - Electrical Final Passed 12-4-25: electrical, mechanical, plumbing, outdoor lighting, building final approved.
12/04/2025 COT - RSEL - Outdoor Lighting Passed 12-4-25: electrical, mechanical, plumbing, outdoor lighting, building final approved.
12/04/2025 COT - RSME - Mechanical Final Passed 12-4-25: electrical, mechanical, plumbing, outdoor lighting, building final approved.
12/04/2025 COT - RSPL - Backwater Valve Passed 12-4-25: approved.
12/04/2025 COT - RSPL - Plumbing Final Passed 12-4-25: electrical, mechanical, plumbing, outdoor lighting, building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
23-112 RIO AZUL APARTMENTS RIO AZUL PARTNERS LLC_V1.PDF DOCUMENTS VIEW
CONS-RIO AZUL FINAL_V2.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERTIFICATE 2105-2024-09-13_V1.PDF DOCUMENTS VIEW