Permit: TC-RES-0624-03519
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
839 E MINORKA RD BLDG 1 UNIT 1104
Address NEW:
839 E MINORKA RD BLDG 1 UNIT 1104
Apply Date:
06/11/2024
Applicant:
Gregory Moore
Description:
Individual unit permit
Permit Reviews
Permit Number - TC-RES-0624-03519
Permit Status: Complete
Permit Description: Individual unit permit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | RESIDENTIAL NEW DWELLING REVISION v.2 | 02/24/2025 | REQUIRES RESUBMIT |
| 02/24/2025 | RESIDENTIAL NEW DWELLING REVISION v.3 | 02/27/2025 | APPROVED |
| 06/17/2024 | RESIDENTIAL NEW DWELLING v.1 | 07/23/2024 | REQUIRES RESUBMIT |
| 09/18/2024 | RESIDENTIAL NEW DWELLING v.2 | 10/15/2024 | APPROVED |
| 01/09/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 02/01/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0624-03519
Permit Status: Complete
Permit Description: Individual unit permit
| Date | Description | Comments |
|---|---|---|
| 06/17/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 11/18/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 10/15/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 10/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/01/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 10/25/2024 | Full payment of Impact fees required prior to issue of CofO/LOC | |
| 02/27/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/01/2024 | Post-Installed Anchor Inspection Report is required. | |
| 02/27/2025 | Post-Tension Inspection Report is required. | |
| 10/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 10/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0624-03519
Permite Description: Individual unit permit
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | 7/9/25: fasteners and hold-downs on exterior sheathing per approved plans ok to proceed. |
| 12/01/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 12/01/2025 | RSBU - Building Final | N/A | Partial Pass | Partial pass. Pending other inspections. 12/1/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0624-03519
Permit Description: Individual unit permit
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2025 | COT - RSPL - Rough Soil | Passed | 5-6-25, sewer connection together with underground plumbing verified per plans and under test. Okay to backfill-shading required. | |
| 05/06/2025 | COT - RSPL - Sewer | Passed | 5-6-25, sewer connection together with underground plumbing verified per plans and under test. Okay to backfill-shading required. | |
| 05/19/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5-19-25, excavation/rebar/setbacks verified per plans. Okay to pour concrete. | |
| 05/19/2025 | COT - RSBU - Preslab | Passed | 5-19-25, preslab verified per approved plans. Okay to pour concrete. | |
| 05/19/2025 | COT - RSEL - Electrical Underground | Passed | 5-19-25, conduits verified per plans. Okay to pour concrete. | |
| 07/08/2025 | COT - RSPL - Yard Water Line | Passed | Approved 3/4" copper water supply from existing main line PVC stub out to Unit #1104 (Bldg1), okay to shade fill progress areas | |
| 07/09/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 08/26/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/26/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/08/2025 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 09/08/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/01/2025 | COT - RSBU - Stem Wall/Retaining Wall | Passed | ||
| 12/01/2025 | COT - RSEL - Electrical Final | Passed | ||
| 12/01/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/01/2025 | COT - RSME - Mechanical Final | Passed | ||
| 12/01/2025 | COT - RSPL - Backwater Valve | Passed | ||
| 12/01/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 12/18/2025 | RSBU - Building Final | Passed |