Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/11/2024
Applicant:
Gregory Moore
Description:
Individual unit permit

Permit Reviews

Permit Number - TC-RES-0624-03517
Permit Status: Complete
Permit Description: Individual unit permit
Start Date Submittal Complete Date Status  
01/09/2025 RESIDENTIAL NEW DWELLING REVISION v.1 02/01/2025 REQUIRES RESUBMIT Review Details
02/14/2025 RESIDENTIAL NEW DWELLING REVISION v.2 02/27/2025 APPROVED Review Details
06/17/2024 RESIDENTIAL NEW DWELLING v.1 07/23/2024 REQUIRES RESUBMIT Review Details
09/16/2024 RESIDENTIAL NEW DWELLING v.2 10/17/2024 APPROVED Review Details
02/27/2025 RESTAMP - RESIDENTIAL v.1 03/04/2025 APPROVED Review Details
03/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0624-03517
Permit Status: Complete
Permit Description: Individual unit permit
Date Description Comments
06/17/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
12/01/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
10/25/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
09/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/25/2024 Full payment of Impact fees required prior to issue of CofO/LOC
02/27/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/17/2024 Post-Installed Anchor Inspection Report is required.
02/27/2025 Post-Tension Inspection Report is required.
09/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-RES-0624-03517
Permite Description: Individual unit permit
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/01/2025 RSBU - Building Final N/A Partial Pass Partial pass. Pending other inspections. 12/1/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0624-03517
Permit Description: Individual unit permit
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/19/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5-19-25, excavation/rebar/setbacks verified per plans. Okay to pour concrete.
05/19/2025 COT - RSEL - Electrical Underground Passed 5-19-25, conduits verified per plans. Okay to pour concrete.
05/19/2025 COT - RSBU - Preslab Passed 5-19-25, preslab verified per approved plans. Okay to pour concrete.
07/08/2025 COT - RSPL - Yard Water Line Passed Approved 3/4" copper water supply from existing main line PVC stub out to Unit #1102 (Bldg1), okay to shade fill progress areas
08/26/2025 COT - RSEL - Grounding/Bonding Passed
08/26/2025 BULD - Electrical Clearance Passed 8/26/25: TEP ECO CLEARANCE FOR 839 E MINORKA RD BLDG 1 UNIT 1102
08/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
09/05/2025 COT - RSBU - Interior Shear Bracing Passed
12/01/2025 COT - RSEL - Electrical Final Passed
12/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/01/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
12/01/2025 COT - RSEL - Outdoor Lighting Passed
12/01/2025 COT - RSME - Mechanical Final Passed
12/01/2025 COT - RSPL - Backwater Valve Passed
12/01/2025 COT - RSPL - Plumbing Final Passed
12/01/2025 COT - RSBU - Roof Nailing Passed
12/01/2025 COT - RSPL - Rough Soil Passed
12/01/2025 COT - RSBU - Stem Wall/Retaining Wall Passed
12/01/2025 COT - RSPL - Sewer Passed
12/18/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
JOIST HANGER OPTION_V1.PDF DOCUMENTS VIEW
POST TENSION 155127 BLDG 1-2025-12-01_V1.PDF DOCUMENTS VIEW
RIO AZUL RESIDENCES -257864_AZ_SEALED_V1.PDF DOCUMENTS VIEW
RIO AZUL RESIDENCES ROOF TRUSS PLACEMENT PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PT SLAB REVISIONS_V2.PDF DOCUMENTS VIEW
124206 RIO AZUL DRAINAGE STEM FOOTING SUPPLEMENTAL CALCS - V2_V1.PDF DOCUMENTS VIEW
124206 RIO AZUL PARTNERS PT FOUNDATION CALCS - V2_V1.PDF DOCUMENTS VIEW
BLDG 1-1102 TC-RES-0624-03517-2025-02-07_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
23-112 RIO AZUL APARTMENTS RIO AZUL PARTNERS LLC_V1.PDF DOCUMENTS VIEW
RIO AZUL FINAL_V1.PDF DOCUMENTS VIEW
SPECIAL INSPECTION CERTIFICATE 1102-2024-09-13_V1.PDF DOCUMENTS VIEW