Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4311 E POE ST
Address NEW:
4311 E POE ST
Apply Date:
06/08/2024
Applicant:
RHONDA RAWSON
Description:
Bedroom Suite Addition

Permit Reviews

Permit Number - TC-RES-0624-03455
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
Start Date Submittal Complete Date Status  
07/16/2024 RESTAMP - RESIDENTIAL v.1 07/16/2024 APPROVED Review Details
07/16/2024 RESIDENTIAL NEW DWELLING v.2 07/16/2024 APPROVED Review Details
06/10/2024 RESIDENTIAL NEW DWELLING v.1 07/08/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-RES-0624-03455
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
Date Description Comments
07/16/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
07/16/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0624-03455
Permit Description: Bedroom Suite Addition
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/23/2024 COT - RSPL - Gas Pressure Test Passed
07/23/2024 COT - RSPL - Sewer Passed
08/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Footing is properly dug, rebar reinforcement is installed and properly lapped at joints. Okay to pour concrete for slab and footings.
08/05/2024 COT - RSBU - Preslab Passed Footing is properly dug, rebar reinforcement is installed and properly lapped at joints. Okay to pour concrete for slab and footings.
10/08/2024 COT - RSBU - Roof Nailing Passed OK to dry-in roof system.
11/01/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/03/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/12/2024 BULD - Electrical Clearance Passed Clearance for TEP INCR. 12/12/2024
02/04/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_4311 E POE PLANS 071024_V2.PDF DOCUMENTS VIEW