Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0624-03455
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4311 E POE ST
Address NEW:
4311 E POE ST
Apply Date:
06/08/2024
Applicant:
RHONDA RAWSON
Description:
Bedroom Suite Addition
Permit Reviews
Permit Number - TC-RES-0624-03455
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/16/2024 | RESTAMP - RESIDENTIAL v.1 | 07/16/2024 | APPROVED |
| 07/16/2024 | RESIDENTIAL NEW DWELLING v.2 | 07/16/2024 | APPROVED |
| 06/10/2024 | RESIDENTIAL NEW DWELLING v.1 | 07/08/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0624-03455
Permit Status: Inspections
Permit Description: Bedroom Suite Addition
| Date | Description | Comments |
|---|---|---|
| 07/16/2024 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 07/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0624-03455
Permit Description: Bedroom Suite Addition
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/23/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/23/2024 | COT - RSPL - Sewer | Passed | ||
| 08/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footing is properly dug, rebar reinforcement is installed and properly lapped at joints. Okay to pour concrete for slab and footings. | |
| 08/05/2024 | COT - RSBU - Preslab | Passed | Footing is properly dug, rebar reinforcement is installed and properly lapped at joints. Okay to pour concrete for slab and footings. | |
| 10/08/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system. | |
| 11/01/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/12/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP INCR. 12/12/2024 | |
| 02/04/2025 | RSBU - Building Final | Passed |