Permit: TC-RES-0624-03370
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
1521 S BRISTOL AV
Address NEW:
1521 S BRISTOL AV
Apply Date:
06/04/2024
Applicant:
Carlos Soto
Description:
MPU 100 Amps to 200 Amps overhead service
Permit Reviews
Permit Number - TC-RES-0624-03370
Permit Status: Issued
Permit Description: MPU 100 Amps to 200 Amps overhead service
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2024 | RESIDENTIAL SIMPLE REVIEW v.1 | 06/05/2024 | APPROVED |
Conditions
Permit Number - TC-RES-0624-03370
Permit Status: Issued
Permit Description: MPU 100 Amps to 200 Amps overhead service
| Date | Description | Comments |
|---|---|---|
| 06/05/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/05/2024 | Power Kill Reconnect Clearances Service upgrades, or changes to the electrical service or systems, that requires the electric utility to be disconnected and re-energized the same day, and requires City of Tucson Development Services to provide a clearance shall be coordinated with City of Tucson Inspections a minimum of two business days prior to the requested inspection date. If a custom time or after-hours inspection is required additional fees will apply. Contact (520) 837-4916 for inspection coordination. If utilizing the “the remote inspection” process, verify you have connectivity, schedule the inspection a couple days ahead to assure your appointment time, and no other coordination is necessary. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0624-03370
Permit Description: MPU 100 Amps to 200 Amps overhead service
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/25/2024 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade, INCR Clearance to TEP is required for the electrical cutover | |
| 07/02/2024 | COT - LCEL - Electrical Final | Passed |