Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Apply Date:
06/04/2024
Applicant:
TFS Solar
Description:
roof mount 1.3 kW DC addition to existing photovoltaic solar system (new total system size: 9.03 kW), 3 additional AC modules (21 modules in total), 1 additional string; 13.5 kWh addition to existing storage system (new total system size: 41 kWh); 1 additional battery, 60A breaker; interconnected to existing breaker on 200A bus with 200A MCB REV1: Increased the number of modules from 3 to 4.

Permit Reviews

Permit Number - TC-RES-0624-03354
Permit Status: Inspections complete
Permit Description: roof mount 1.3 kW DC addition to existing photovoltaic solar system (new total system size: 9.03 kW), 3 additional AC modules (21 modules in total), 1 additional string; 13.5 kWh addition to existing storage system (new total system size: 41 kWh); 1 additional battery, 60A breaker; interconnected to existing breaker on 200A bus with 200A MCB REV1: Increased the number of modules from 3 to 4.
Start Date Submittal Complete Date Status  
06/04/2024 RESIDENTIAL SOLAR v.1 06/21/2024 APPROVED Review Details
06/26/2024 RESIDENTIAL SOLAR v.1 07/17/2024 APPROVED Review Details

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0624-03354
Permit Description: roof mount 1.3 kW DC addition to existing photovoltaic solar system (new total system size: 9.03 kW), 3 additional AC modules (21 modules in total), 1 additional string; 13.5 kWh addition to existing storage system (new total system size: 41 kWh); 1 additional battery, 60A breaker; interconnected to existing breaker on 200A bus with 200A MCB REV1: Increased the number of modules from 3 to 4.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/14/2024 RSBU - Building Final Passed
08/14/2024 COT - RSOL - Electrical Final Solar Project Passed
08/14/2024 BULD - Electrical Clearance Passed Approved solar and battery addition to existing - DGC/BAT Clearance to TEP is required

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOMQUIST STEVEN PV ADD STORAGE ADD - REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
CONS-REV1 BLOMQUIST STEVEN PV ADD 1.72 KW STORAGE ADD 13.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW
REV1 BLOMQUIST STEVEN PV ADD 1.29 KW STORAGE ADD 13.5 KWH-SPECS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOMQUIST STEVEN PV ADD 1.29 KW STORAGE ADD 13.5 KWH-SPECS_V1.PDF DOCUMENTS VIEW
CONS-BLOMQUIST STEVEN PV ADD 1.29 KW STORAGE ADD 13.5 KWH-DRAWINGS_V1.PDF DOCUMENTS VIEW