Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0624-03354
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
845 W PLACITA ESTRELLA AZUL
Address NEW:
845 W PLACITA ESTRELLA AZUL
Apply Date:
06/04/2024
Applicant:
TFS Solar
Description:
roof mount 1.3 kW DC addition to existing photovoltaic solar system (new total system size: 9.03 kW), 3 additional AC modules (21 modules in total), 1 additional string; 13.5 kWh addition to existing storage system (new total system size: 41 kWh); 1 additional battery, 60A breaker; interconnected to existing breaker on 200A bus with 200A MCB REV1: Increased the number of modules from 3 to 4.
Permit Reviews
Permit Number - TC-RES-0624-03354
Permit Status: Complete
Permit Description: roof mount 1.3 kW DC addition to existing photovoltaic solar system (new total system size: 9.03 kW), 3 additional AC modules (21 modules in total), 1 additional string; 13.5 kWh addition to existing storage system (new total system size: 41 kWh); 1 additional battery, 60A breaker; interconnected to existing breaker on 200A bus with 200A MCB
REV1: Increased the number of modules from 3 to 4.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/04/2024 | RESIDENTIAL SOLAR v.1 | 06/21/2024 | APPROVED |
| 06/26/2024 | RESIDENTIAL SOLAR v.1 | 07/17/2024 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0624-03354
Permit Description: roof mount 1.3 kW DC addition to existing photovoltaic solar system (new total system size: 9.03 kW), 3 additional AC modules (21 modules in total), 1 additional string; 13.5 kWh addition to existing storage system (new total system size: 41 kWh); 1 additional battery, 60A breaker; interconnected to existing breaker on 200A bus with 200A MCB
REV1: Increased the number of modules from 3 to 4.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2024 | RSBU - Building Final | Passed | ||
| 08/14/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 08/14/2024 | BULD - Electrical Clearance | Passed | Approved solar and battery addition to existing - DGC/BAT Clearance to TEP is required |