Permit: TC-RES-0623-06101
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
727 N TREAT AV
Address NEW:
727 N TREAT AV
Apply Date:
06/23/2023
Applicant:
TFS Solar
Description:
roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 7.48 kW), 4 additional DC modules on 1 existing inverter with 2 existing strings, 40A PV breaker on 200A bus with 200A MCB
Permit Reviews
Permit Number - TC-RES-0623-06101
Permit Status: Complete
Permit Description: roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 7.48 kW), 4 additional DC modules on 1 existing inverter with 2 existing strings, 40A PV breaker on 200A bus with 200A MCB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/19/2023 | RESIDENTIAL SOLAR v.2 | 10/25/2023 | APPROVED |
| 06/27/2023 | RESIDENTIAL SOLAR v.1 | 07/17/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0623-06101
Permit Status: Complete
Permit Description: roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 7.48 kW), 4 additional DC modules on 1 existing inverter with 2 existing strings, 40A PV breaker on 200A bus with 200A MCB
| Date | Description | Comments |
|---|---|---|
| 10/25/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-06101
Permit Description: roof mount 1.6 kW DC addition to existing photovoltaic solar system (new total system size: 7.48 kW), 4 additional DC modules on 1 existing inverter with 2 existing strings, 40A PV breaker on 200A bus with 200A MCB
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2023 | RSBU - Building Final | Passed | ||
| 11/13/2023 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 11/13/2023 | BULD - Electrical Clearance | Passed | DGC has been updated |