Permit: TC-RES-0623-05958
Permit Details
Apply Date:
06/15/2023
Applicant:
Aime Rutaganira
Description:
Bedroom with Bathroom and Porch Addition
Permit Reviews
Permit Number - TC-RES-0623-05958
Permit Status: Issued
Permit Description: Bedroom with Bathroom and Porch Addition
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/22/2023 | RESIDENTIAL NEW DWELLING v.2 | 09/07/2023 | REQUIRES RESUBMIT |
06/20/2023 | RESIDENTIAL NEW DWELLING v.1 | 07/12/2023 | REQUIRES RESUBMIT |
09/07/2023 | RESIDENTIAL NEW DWELLING v.3 | 09/07/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0623-05958
Permit Status: Issued
Permit Description: Bedroom with Bathroom and Porch Addition
Date | Description | Comments |
---|---|---|
09/07/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-RES-0623-05958
Permite Description: Bedroom with Bathroom and Porch Addition
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/11/2024 | RSBU - Building Final | N/A | Re-inspection required | Install landing at exterior door. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-RES-0623-05958
Permit Description: Bedroom with Bathroom and Porch Addition
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2023 | RSPL - Plumbing Progress | Passed | ||
10/02/2023 | COT - RSPL - Rough Soil | Passed | ||
10/11/2023 | COT - RSBU - Preslab | Passed | 10/11/23 Need's plumbing wrapped before pour | |
10/11/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/11/23 Need's plumbing wrapped before pour | |
11/09/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/09/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/05/2024 | RSBU - Building Final | Passed | Bathroom and playroom addition is complete. Okay to issue Certificate of Completion for this project. |