Permit: TC-RES-0623-05929
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8270 E VICKSBURG ST
Address NEW:
8270 E VICKSBURG ST
Apply Date:
06/14/2023
Applicant:
WILLIAM LAWTON
Description:
INSTALLATION OF ADDITIONAL 18 MODULES, 7.2 kW DC FIXED-TILT ROOF MOUNTED SOLAR PV ARRAYS TO EXISTING 28 MODULE, 7.0 kW DC SYSTEM ON EXISTING SPRAYED FOAM ROOF PLANE SURFACE.
Permit Reviews
Permit Number - TC-RES-0623-05929
Permit Status: Complete
Permit Description: INSTALLATION OF ADDITIONAL 18 MODULES, 7.2 kW DC FIXED-TILT ROOF MOUNTED SOLAR PV ARRAYS TO EXISTING 28 MODULE, 7.0 kW DC SYSTEM ON EXISTING SPRAYED FOAM ROOF PLANE SURFACE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/20/2023 | RESIDENTIAL SOLAR v.1 | 07/10/2023 | REQUIRES RESUBMIT |
| 07/24/2023 | RESIDENTIAL SOLAR v.2 | 08/04/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05929
Permite Description: INSTALLATION OF ADDITIONAL 18 MODULES, 7.2 kW DC FIXED-TILT ROOF MOUNTED SOLAR PV ARRAYS TO EXISTING 28 MODULE, 7.0 kW DC SYSTEM ON EXISTING SPRAYED FOAM ROOF PLANE SURFACE.
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/20/2023 | COT - RSOL - Electrical Final Solar Project | N/A | Not Ready | |
| 09/20/2023 | RSBU - Building Final | N/A | Not Ready | |
| 09/20/2023 | COT - RSOL - Grounding/Bonding Solar Project | N/A | Not Ready | 9/20/23: contractor never called back |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05929
Permit Description: INSTALLATION OF ADDITIONAL 18 MODULES, 7.2 kW DC FIXED-TILT ROOF MOUNTED SOLAR PV ARRAYS TO EXISTING 28 MODULE, 7.0 kW DC SYSTEM ON EXISTING SPRAYED FOAM ROOF PLANE SURFACE.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2023 | BULD - Electrical Clearance | Passed | 10/26/2023. Clearance for TEP DGL/DGC. | |
| 10/26/2023 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/26/2023 | RSBU - Building Final | Passed | ||
| 11/06/2023 | COT - RSOL - Grounding/Bonding Solar Project | Passed |