Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Address NEW:
757 W SANTA MARIA ST
Apply Date:
06/11/2023
Applicant:
Francisco SOTO
Description:
Bedroom and Bathroom Addition

Permit Reviews

Permit Number - TC-RES-0623-05827
Permit Status: Issued
Permit Description: Bedroom and Bathroom Addition
Start Date Submittal Complete Date Status  
06/12/2023 RESIDENTIAL NEW DWELLING v.1 07/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-RES-0623-05827
Permit Status: Issued
Permit Description: Bedroom and Bathroom Addition
Date Description Comments
07/05/2023 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/integrated-planning/PDSD/PDSD_Owner_Builder_Affidavit.pdf, is required prior to issuance of permit.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-RES-0623-05827
Permite Description: Bedroom and Bathroom Addition
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/19/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 9/19/23: electrical and plumbing passed, mini split will need to be added to plans (revision required for mechanical)

Completed Inspections

Permit Status: Issued
Permit Number: TC-RES-0623-05827
Permit Description: Bedroom and Bathroom Addition
Total Completed Inspections - 11
Date Description Inspector Results Comments
08/09/2023 COT - RSBU - Preslab Passed Footing is dug 12" into native soil. Rebar reinforcement is properly in place, ufer ground is attached to rebar reinforcement. Forms are set for concrete slab on grade. Okay to pour concrete.
08/09/2023 COT - RSPL - Rough Soil Passed Underground plumbing is holding a water test. Okay to shade pipes and backfill trenches.
08/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Footing is dug 12" into native soil. Rebar reinforcement is properly in place, ufer ground is attached to rebar reinforcement.
08/09/2023 COT - RSEL - Grounding/Bonding Passed Footing is dug 12" into native soil. Rebar reinforcement is properly in place, ufer ground is attached to rebar reinforcement.
08/30/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 8/30/23: window in bedroom will need to meet proper egress height no more than 44". will be checked at intermediate
08/30/2023 COT - RSBU - Roof Nailing Passed 8/30/23: Roof nailing passed electrical panel must be relocated to exterior of addition before installation of missing roof sheathing.
09/19/2023 BULD - Electrical Clearance Passed 9/19/23: TEP INCR (panel relocated) cutover scheduling
12/07/2023 COT - RSPL - Plumbing Final Passed
12/07/2023 COT - RSEL - Electrical Final Passed 12/7/23: condenser unit not securely fastened to roof. Toilet not caulked, Vents above roof line need to be painted.
12/7/23: all corrections made
12/07/2023 COT - RSME - Mechanical Final Passed 12/7/23: condenser unit not securely fastened to roof. Toilet not caulked, Vents above roof line need to be painted.
12/7/23: all corrections made
12/07/2023 RSBU - Building Final Passed 12/7/23: condenser unit not securely fastened to roof. Toilet not caulked, Vents above roof line need to be painted.
12/7/23: all corrections made

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SANTA MARIA__V1.PDF DOCUMENTS VIEW