Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
2032 N CLOVERLAND AV
Apply Date:
06/07/2023
Applicant:
TFS Solar
Description:
roof mount 3.4 kW DC addition to existing photovoltaic solar system (new total system size: 12.36 kW), 8 additional modules, 1 additional branch circuit, PV subpanel, 80A PV breaker on 200A Generation Panel w/ 150A MCB 46 modules

Permit Reviews

Permit Number - TC-RES-0623-05737
Permit Status: Complete
Permit Description: roof mount 3.4 kW DC addition to existing photovoltaic solar system (new total system size: 12.36 kW), 8 additional modules, 1 additional branch circuit, PV subpanel, 80A PV breaker on 200A Generation Panel w/ 150A MCB 46 modules
Start Date Submittal Complete Date Status  
06/08/2023 RESIDENTIAL SOLAR v.1 07/03/2023 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0623-05737
Permit Description: roof mount 3.4 kW DC addition to existing photovoltaic solar system (new total system size: 12.36 kW), 8 additional modules, 1 additional branch circuit, PV subpanel, 80A PV breaker on 200A Generation Panel w/ 150A MCB 46 modules
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/02/2023 RSBU - Building Final Passed
11/02/2023 COT - RSOL - Electrical Final Solar Project Passed
11/02/2023 BULD - Electrical Clearance Passed Approved, DGC / BAT Clearance to TEP is required for the solar meter and existing Battery

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ABDULAZIZ, M. PV ADD3 3.4 KW-SPECS_V1.PDF DOCUMENTS VIEW
CONS-ABDULAZIZ, M. PV ADD3 3.4 KW-DRAWINGS_V1.PDF DOCUMENTS VIEW