Permit: TC-RES-0623-05690
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2541 W BRANDY CREST DR
Address NEW:
2541 W BRANDY CREST DR
Apply Date:
06/06/2023
Applicant:
TFS Solar
Description:
roof mount 7.38 kW DC photovoltaic solar system, 18 AC modules, 2 branches, PV combiner box, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet
Permit Reviews
Permit Number - TC-RES-0623-05690
Permit Status: Complete
Permit Description: roof mount 7.38 kW DC photovoltaic solar system, 18 AC modules, 2 branches, PV combiner box, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/07/2023 | RESIDENTIAL SOLAR v.1 | 06/29/2023 | APPROVED |
| 09/05/2023 | RESIDENTIAL SOLAR v.1 | 09/13/2023 | APPROVED |
Conditions
Permit Number - TC-RES-0623-05690
Permit Status: Complete
Permit Description: roof mount 7.38 kW DC photovoltaic solar system, 18 AC modules, 2 branches, PV combiner box, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet
| Date | Description | Comments |
|---|---|---|
| 09/14/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05690
Permit Description: roof mount 7.38 kW DC photovoltaic solar system, 18 AC modules, 2 branches, PV combiner box, 40A PV breaker on 200A bus with 200A MCB, NEMA 14-50 outlet
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2024 | RSBU - Building Final | Passed | ||
| 01/17/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 01/17/2024 | BULD - Electrical Clearance | Passed | Approved solar and EV receptacle, DGC Clearance to TEP is required for the solar meter |