Permit: TC-RES-0623-05658
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2131 E BALSAM CI
Address NEW:
2131 E BALSAM CI
Apply Date:
06/05/2023
Applicant:
Brittney Neely
Description:
Installation of a 11.745 kW rooftop mounted photovoltaic system
Permit Reviews
Permit Number - TC-RES-0623-05658
Permit Status: Complete
Permit Description: Installation of a 11.745 kW rooftop mounted photovoltaic system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/07/2023 | RESIDENTIAL SOLAR v.1 | 06/29/2023 | APPROVED |
| 07/06/2023 | RESIDENTIAL SOLAR v.1 | 07/17/2023 | APPROVED |
| 08/02/2023 | RESIDENTIAL SOLAR v.1 | 10/02/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-RES-0623-05658
Permit Status: Complete
Permit Description: Installation of a 11.745 kW rooftop mounted photovoltaic system
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/02/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05658
Permit Description: Installation of a 11.745 kW rooftop mounted photovoltaic system
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/18/2023 | BULD - Electrical Clearance | Passed | Approved, DGC clearance to TEP is required for the solar meter | |
| 10/18/2023 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/18/2023 | RSBU - Building Final | Passed |