Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0623-05619
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8257 E 19TH ST
Address NEW:
8257 E 19TH ST
Apply Date:
06/02/2023
Applicant:
Marytine Ramos
Description:
Installation of a 6.75 kW DC/ 4.87KW AC pv system 15 modules
Permit Reviews
Permit Number - TC-RES-0623-05619
Permit Status: Complete
Permit Description: Installation of a 6.75 kW DC/ 4.87KW AC pv system
15 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2023 | RESIDENTIAL SOLAR v.1 | 06/26/2023 | APPROVED |
| 08/04/2023 | RESIDENTIAL SOLAR v.1 | 08/07/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05619
Permite Description: Installation of a 6.75 kW DC/ 4.87KW AC pv system
15 modules
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2023 | RSBU - Building Final | N/A | Re-inspection required | |
| 08/22/2023 | COT - RSOL - Electrical Final Solar Project | N/A | Re-inspection required | NR, verify piercing connectors for line-side tap within the main panel |
| 10/19/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for a line-side tap, DGL Clearance was called into TEP at 2:00pm |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0623-05619
Permit Description: Installation of a 6.75 kW DC/ 4.87KW AC pv system
15 modules
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2024 | RSBU - Building Final | Passed | ||
| 03/14/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 03/14/2024 | BULD - Electrical Clearance | Passed |