Permit: TC-RES-0526-02853
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
6791 E 3RD ST
Address NEW:
6791 E 3RD ST
Apply Date:
05/29/2026
Applicant:
Samuel Alvarez
Description:
Replace gas service line from meter at alley too house inlet supply. approximately 40'
Permit Reviews
Permit Number - TC-RES-0526-02853
Permit Status: Complete
Permit Description: Replace gas service line from meter at alley too house inlet supply. approximately 40'
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 06/01/2026 | REQUIRES RESUBMIT |
| 06/01/2026 | RESIDENTIAL SIMPLE REVIEW v.2 | 06/01/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0526-02853
Permit Status: Complete
Permit Description: Replace gas service line from meter at alley too house inlet supply. approximately 40'
| Date | Description | Comments |
|---|---|---|
| 06/01/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0526-02853
Permit Description: Replace gas service line from meter at alley too house inlet supply. approximately 40'
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2026 | COT - BULD - SWG Clearance | Passed | 06/02/2026 Clearance SWG. |
|
| 06/02/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/02/2026 | COT - RSPL - Rough Soil | Passed | 06/02/2026 PE line under test, okay to backfill with shading material. |
|
| 06/02/2026 | RSBU - Building Final | Passed |