Permit: TC-RES-0526-02439
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3494 W RED BIRD CT
Address NEW:
3494 W RED BIRD CT
Apply Date:
05/09/2026
Applicant:
Ed Estolano
Description:
Repipe of hot and cold water distribution system in full from the service entrance to all the plumbing fixtures in the house.
Permit Reviews
Permit Number - TC-RES-0526-02439
Permit Status: Complete
Permit Description: Repipe of hot and cold water distribution system in full from the service entrance to all the plumbing fixtures in the house.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/11/2026 | RESIDENTIAL SIMPLE REVIEW v.1 | 05/11/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0526-02439
Permit Status: Complete
Permit Description: Repipe of hot and cold water distribution system in full from the service entrance to all the plumbing fixtures in the house.
| Date | Description | Comments |
|---|---|---|
| 05/11/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0526-02439
Permit Description: Repipe of hot and cold water distribution system in full from the service entrance to all the plumbing fixtures in the house.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2026 | RSBU - Building Final | Passed | ||
| 05/14/2026 | COT - RSPL - Yard Water Line | Passed | O5/14/2026 Approved per plan, holding under test to new riser with PRV. Okay to backfill with shading. |
|
| 05/14/2026 | COT - RSPL - Plumbing Final | Passed |