Permit: TC-RES-0526-02414
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
237 W ILLINOIS ST
Address NEW:
237 W ILLINOIS ST
Apply Date:
05/07/2026
Applicant:
Brittany Vasquez
Description:
Convert shower to shower - replacing pan, drain, and valves. Bath 1 - converting tub to shower - replacing tub, drain, and valves. Bath 2 - converting tub to tub - replacing tub, drain, and valves.
Permit Reviews
Permit Number - TC-RES-0526-02414
Permit Status: Inspections
Permit Description: Convert shower to shower - replacing pan, drain, and valves.
Bath 1 - converting tub to shower - replacing tub, drain, and valves.
Bath 2 - converting tub to tub - replacing tub, drain, and valves.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/11/2026 | RESIDENTIAL ADD/ALT v.1 | 05/20/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0526-02414
Permit Status: Inspections
Permit Description: Convert shower to shower - replacing pan, drain, and valves.
Bath 1 - converting tub to shower - replacing tub, drain, and valves.
Bath 2 - converting tub to tub - replacing tub, drain, and valves.
| Date | Description | Comments |
|---|---|---|
| 05/11/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0526-02414
Permit Description: Convert shower to shower - replacing pan, drain, and valves.
Bath 1 - converting tub to shower - replacing tub, drain, and valves.
Bath 2 - converting tub to tub - replacing tub, drain, and valves.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2026 | COT - RSPL - Rough Soil | Passed | 07/09/2026 Verified ABS with p-trap for shower, PEX secured and holding at primary bathroom. |
|
| 07/27/2026 | COT - RSPL - Plumbing Final | Passed | 07/27/2026 Approved per plan. |