Permit: TC-RES-0526-02401
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2581 E CAMBRIDGE RING DR
Address NEW:
2581 E CAMBRIDGE RING DR
Apply Date:
05/07/2026
Applicant:
Brittany Vasquez
Description:
Master - converting tub to shower - replacing tub, drain, and valves. Guest - converting tub to tub - replacing tub, drain, and valves.
Permit Reviews
Permit Number - TC-RES-0526-02401
Permit Status: Inspections
Permit Description: Master - converting tub to shower - replacing tub, drain, and valves.
Guest - converting tub to tub - replacing tub, drain, and valves.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2026 | RESIDENTIAL ADD/ALT v.1 | 05/27/2026 | APPROVED |
Conditions
Permit Number - TC-RES-0526-02401
Permit Status: Inspections
Permit Description: Master - converting tub to shower - replacing tub, drain, and valves.
Guest - converting tub to tub - replacing tub, drain, and valves.
| Date | Description | Comments |
|---|---|---|
| 05/08/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0526-02401
Permit Description: Master - converting tub to shower - replacing tub, drain, and valves.
Guest - converting tub to tub - replacing tub, drain, and valves.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2026 | RSPL - Plumbing Progress | Passed | tie in, rough in, pressure | |
| 06/05/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/09/2026 | COT - RSPL - Plumbing Final | Passed | 07/09/2026 Approved per plan. |