Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Residential Building - One or Two Family
Apply Date:
05/07/2026
Applicant:
Brittany Vasquez
Description:
Master - converting tub to shower - replacing tub, drain, and valves. Guest - converting tub to tub - replacing tub, drain, and valves.

Permit Reviews

Permit Number - TC-RES-0526-02401
Permit Status: Inspections
Permit Description: Master - converting tub to shower - replacing tub, drain, and valves. Guest - converting tub to tub - replacing tub, drain, and valves.
Start Date Submittal Complete Date Status  
05/08/2026 RESIDENTIAL ADD/ALT v.1 05/27/2026 APPROVED Review Details

Conditions

Permit Number - TC-RES-0526-02401
Permit Status: Inspections
Permit Description: Master - converting tub to shower - replacing tub, drain, and valves. Guest - converting tub to tub - replacing tub, drain, and valves.
Date Description Comments
05/08/2026 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-RES-0526-02401
Permit Description: Master - converting tub to shower - replacing tub, drain, and valves. Guest - converting tub to tub - replacing tub, drain, and valves.
Total Completed Inspections - 3
Date Description Inspector Results Comments
06/03/2026 RSPL - Plumbing Progress Passed tie in, rough in, pressure
06/05/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/09/2026 COT - RSPL - Plumbing Final Passed 07/09/2026
Approved per plan.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-LLD ARIEL - CHRIS MARTINEZ_V1.PDF DOCUMENTS VIEW