Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2902 E COPPER ST
Address NEW:
2902 E COPPER ST
Apply Date:
05/27/2025
Applicant:
TFS Solar
Description:
Roof mount 2.6kW DC addition to existing photovoltaic solar system. New system size is 8.91kW DC. 6 additional modules; 27 kWh Storage. 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 1 battery expansion pack, (no inverter). Upsize solar meter and utility isolation disconnect. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.

Permit Reviews

Permit Number - TC-RES-0525-02736
Permit Status: Complete
Permit Description: Roof mount 2.6kW DC addition to existing photovoltaic solar system. New system size is 8.91kW DC. 6 additional modules; 27 kWh Storage. 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 1 battery expansion pack, (no inverter). Upsize solar meter and utility isolation disconnect. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Start Date Submittal Complete Date Status  
05/27/2025 RESIDENTIAL SOLAR v.1 06/24/2025 REQUIRES RESUBMIT Review Details
07/14/2025 RESIDENTIAL SOLAR v.2 07/17/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0525-02736
Permit Description: Roof mount 2.6kW DC addition to existing photovoltaic solar system. New system size is 8.91kW DC. 6 additional modules; 27 kWh Storage. 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 1 battery expansion pack, (no inverter). Upsize solar meter and utility isolation disconnect. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/11/2025 RSBU - Building Final Passed
08/11/2025 COT - RSOL - Electrical Final Solar Project Passed
08/11/2025 BULD - Electrical Clearance Passed Approved solar with PW 3 - DGC/BAT Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-FALES DAVID PV COMBO 2.61 KW STORAGE 27 KWH-DRAWINGS W EE_V2.PDF DOCUMENTS VIEW