Permit: TC-RES-0525-02736
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2902 E COPPER ST
Address NEW:
2902 E COPPER ST
Apply Date:
05/27/2025
Applicant:
TFS Solar
Description:
Roof mount 2.6kW DC addition to existing photovoltaic solar system. New system size is 8.91kW DC. 6 additional modules; 27 kWh Storage. 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 1 battery expansion pack, (no inverter). Upsize solar meter and utility isolation disconnect. 200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Permit Reviews
Permit Number - TC-RES-0525-02736
Permit Status: Complete
Permit Description: Roof mount 2.6kW DC addition to existing photovoltaic solar system. New system size is 8.91kW DC. 6 additional modules; 27 kWh Storage. 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 1 battery expansion pack, (no inverter). Upsize solar meter and utility isolation disconnect.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/27/2025 | RESIDENTIAL SOLAR v.1 | 06/24/2025 | REQUIRES RESUBMIT |
| 07/14/2025 | RESIDENTIAL SOLAR v.2 | 07/17/2025 | APPROVED |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0525-02736
Permit Description: Roof mount 2.6kW DC addition to existing photovoltaic solar system. New system size is 8.91kW DC. 6 additional modules; 27 kWh Storage. 1 Tesla Powerwall-3 battery with integrated PV inverter with 1 string. 1 battery expansion pack, (no inverter). Upsize solar meter and utility isolation disconnect.
200A bus with 200A MCB, interconnection via PCS, Tesla Backup Switch for whole home backup.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2025 | RSBU - Building Final | Passed | ||
| 08/11/2025 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 08/11/2025 | BULD - Electrical Clearance | Passed | Approved solar with PW 3 - DGC/BAT Clearance to TEP is required for the solar meter |