Permit: TC-RES-0525-02721
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
4205 E KILMER ST
Address NEW:
4205 E KILMER ST
Apply Date:
05/24/2025
Applicant:
Benjamin Howayeck
Description:
1280 sqft two story addition (716 sqft first floor 564 sqft second floor) 447 sqft remodel 278 sqft roof replacement
Permit Reviews
Permit Number - TC-RES-0525-02721
Permit Status: Inspections
Permit Description: 1280 sqft two story addition
(716 sqft first floor 564 sqft second floor)
447 sqft remodel
278 sqft roof replacement
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/22/2025 | RESTAMP - RESIDENTIAL v.1 | 08/25/2025 | APPROVED |
| 07/24/2025 | RESIDENTIAL NEW DWELLING v.2 | 08/22/2025 | APPROVED |
| 05/27/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/26/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0525-02721
Permit Status: Inspections
Permit Description: 1280 sqft two story addition
(716 sqft first floor 564 sqft second floor)
447 sqft remodel
278 sqft roof replacement
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 06/23/2025 | Masonry Inspection Report submittal review is required. |
| 06/23/2025 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-RES-0525-02721
Permit Status: Inspections
Permit Description: 1280 sqft two story addition
(716 sqft first floor 564 sqft second floor)
447 sqft remodel
278 sqft roof replacement
| Date | Description | Comments |
|---|---|---|
| 05/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02721
Permite Description: 1280 sqft two story addition
(716 sqft first floor 564 sqft second floor)
447 sqft remodel
278 sqft roof replacement
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2025 | COT - RSBU - Preslab | N/A | Partial Pass | Partial pass. Slab approved for concrete. 10/17/2025 |
| 01/06/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Partial Pass | Exterior sheathing and straps. Ok to cover exterior walls. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02721
Permit Description: 1280 sqft two story addition
(716 sqft first floor 564 sqft second floor)
447 sqft remodel
278 sqft roof replacement
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 10/14/2025 | |
| 11/12/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 01/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 1/27/26 |