Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
3535 E MONTHAN SV
Apply Date:
05/21/2025
Applicant:
Dean Bagley
Description:
- We will begin by digging down at the meter and digging underneath the block wall. - We will then trench under the block wall. - Once under the block wall, we will go onto the other side and move bricks from the area. - We will then trench down 18” along 20ft. - We will then go home and move the stove and cut drywall, and drill a hole up onto the roof. - We will then go into the water heater closet and drill a hole up onto the roof. - Once the area is fully prepped for the new line, we will run a tee off the meter, tying into the furnace for the pool, and running a line into the trench up to the house, going up and over along roof. - We then tee off line and run a section of pipe going to the stove and a section going to the water heater, installing new sediment traps as needed, as well as new gas valves and supply lines. - Once finished, we will put the system to test and submit permits. - Once permits are completed, we will then backfill and clean up any debris.

Permit Reviews

Permit Number - TC-RES-0525-02661
Permit Status: Complete
Permit Description: - We will begin by digging down at the meter and digging underneath the block wall. - We will then trench under the block wall. - Once under the block wall, we will go onto the other side and move bricks from the area. - We will then trench down 18” along 20ft. - We will then go home and move the stove and cut drywall, and drill a hole up onto the roof. - We will then go into the water heater closet and drill a hole up onto the roof. - Once the area is fully prepped for the new line, we will run a tee off the meter, tying into the furnace for the pool, and running a line into the trench up to the house, going up and over along roof. - We then tee off line and run a section of pipe going to the stove and a section going to the water heater, installing new sediment traps as needed, as well as new gas valves and supply lines. - Once finished, we will put the system to test and submit permits. - Once permits are completed, we will then backfill and clean up any debris.
Start Date Submittal Complete Date Status  
05/21/2025 RESIDENTIAL SIMPLE REVIEW v.1 05/21/2025 REQUIRES RESUBMIT Review Details
05/23/2025 RESIDENTIAL SIMPLE REVIEW v.2 05/26/2025 APPROVED Review Details

Conditions

Permit Number - TC-RES-0525-02661
Permit Status: Complete
Permit Description: - We will begin by digging down at the meter and digging underneath the block wall. - We will then trench under the block wall. - Once under the block wall, we will go onto the other side and move bricks from the area. - We will then trench down 18” along 20ft. - We will then go home and move the stove and cut drywall, and drill a hole up onto the roof. - We will then go into the water heater closet and drill a hole up onto the roof. - Once the area is fully prepped for the new line, we will run a tee off the meter, tying into the furnace for the pool, and running a line into the trench up to the house, going up and over along roof. - We then tee off line and run a section of pipe going to the stove and a section going to the water heater, installing new sediment traps as needed, as well as new gas valves and supply lines. - Once finished, we will put the system to test and submit permits. - Once permits are completed, we will then backfill and clean up any debris.
Date Description Comments
05/26/2025 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
05/21/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0525-02661
Permit Description: - We will begin by digging down at the meter and digging underneath the block wall. - We will then trench under the block wall. - Once under the block wall, we will go onto the other side and move bricks from the area. - We will then trench down 18” along 20ft. - We will then go home and move the stove and cut drywall, and drill a hole up onto the roof. - We will then go into the water heater closet and drill a hole up onto the roof. - Once the area is fully prepped for the new line, we will run a tee off the meter, tying into the furnace for the pool, and running a line into the trench up to the house, going up and over along roof. - We then tee off line and run a section of pipe going to the stove and a section going to the water heater, installing new sediment traps as needed, as well as new gas valves and supply lines. - Once finished, we will put the system to test and submit permits. - Once permits are completed, we will then backfill and clean up any debris.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/30/2025 COT - BULD - SWG Clearance Passed 5.30.25 lines verified at appropriate depth, gauge functional and under test at 15psi. Shut off valves verified. Properly sealed at roof and supported. Approved.
05/30/2025 RSBU - Building Final Passed 5.30.25 lines verified at appropriate depth, gauge functional and under test at 15psi. Shut off valves verified. Properly sealed at roof and supported. Approved.
05/30/2025 COT - RSPL - Plumbing Final Passed 5.30.25 lines verified at appropriate depth, gauge functional and under test at 15psi. Shut off valves verified. Properly sealed at roof and supported. Approved.
05/30/2025 RSPL - Plumbing Progress Passed 5.30.25 lines verified at appropriate depth, gauge functional and under test at 15psi. Shut off valves verified. Properly sealed at roof and supported. Approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BERNADETTE GAS LINE_V2.PDF DOCUMENTS VIEW