Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
05/14/2025
Applicant:
Project Manager
Description:
Installation of a 4.150kw dc system/1 Tesla Battery

Permit Reviews

Permit Number - TC-RES-0525-02560
Permit Status: Complete
Permit Description: Installation of a 4.150kw dc system/1 Tesla Battery
Start Date Submittal Complete Date Status  
05/15/2025 RESIDENTIAL SOLAR v.1 06/13/2025 APPROVED Review Details
06/23/2025 RESIDENTIAL SOLAR REVISION v.1 07/21/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TC-RES-0525-02560
Permit Description: Installation of a 4.150kw dc system/1 Tesla Battery
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/28/2025 BULD - Electrical Clearance Passed Approved solar with PW 3 - DGC/BAT Clearance to TEP is required for the solar meter
07/28/2025 COT - RSOL - Grounding/Bonding Solar Project Passed
07/28/2025 RSBU - Building Final Passed
07/28/2025 COT - RSOL - Electrical Final Solar Project Passed Approved solar with PW 3 - DGC/BAT Clearance to TEP is required for the solar meter

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLANS_V1.PDF DOCUMENTS VIEW
LOAD CALCS_V1.PDF DOCUMENTS VIEW
PE CALCS_V1.PDF DOCUMENTS VIEW