Permit: TC-RES-0525-02364
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
7148 E 29TH ST
Address NEW:
7148 E 29TH ST
Apply Date:
05/04/2025
Applicant:
Eugene Sdobnev
Description:
Upgrade old Panel to New 200 amp panel
Permit Reviews
Permit Number - TC-RES-0525-02364
Permit Status: Inspections
Permit Description: Upgrade old Panel to New 200 amp panel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/05/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 05/05/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0525-02364
Permit Status: Inspections
Permit Description: Upgrade old Panel to New 200 amp panel
| Date | Description | Comments |
|---|---|---|
| 05/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02364
Permite Description: Upgrade old Panel to New 200 amp panel
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2025 | COT - RSEL - Electrical Final | N/A | Canceled | 8.27.25 Canceled per contractor |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02364
Permit Description: Upgrade old Panel to New 200 amp panel
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2025 | BULD - Electrical Clearance | Passed | Approved 200A service panel upgrade - INCR Clearance to TEP is required for the cutover Pending final |