Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0525-02345
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1543 E LINDEN ST
Address NEW:
1543 E LINDEN ST
Apply Date:
05/02/2025
Applicant:
Dianna Taylor
Description:
foundation repair per engineer plan
Permit Reviews
Permit Number - TC-RES-0525-02345
Permit Status: Inspections complete
Permit Description: foundation repair per engineer plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/26/2025 | APPROVED |
| 05/05/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/09/2025 | APPROVED |
| 11/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-RES-0525-02345
Permit Status: Inspections complete
Permit Description: foundation repair per engineer plan
| Date | Description | Comments |
|---|---|---|
| 05/05/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/02/2025 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 06/02/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0525-02345
Permit Description: foundation repair per engineer plan
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2025 | RSBU - Building Final | Passed | Information has been forwarded to PSDS. |