Permit: TC-RES-0525-02326
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
6850 E NEW HAMPSHIRE DR
Address NEW:
6850 E NEW HAMPSHIRE DR
Apply Date:
05/01/2025
Applicant:
trevor kuykendall
Description:
remove all old cast iron sewer piping and install new ABS piping
Permit Reviews
Permit Number - TC-RES-0525-02326
Permit Status: Inspections
Permit Description: remove all old cast iron sewer piping and install new ABS piping
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 05/05/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0525-02326
Permit Status: Inspections
Permit Description: remove all old cast iron sewer piping and install new ABS piping
| Date | Description | Comments |
|---|---|---|
| 05/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02326
Permite Description: remove all old cast iron sewer piping and install new ABS piping
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | COT - RSPL - Rough Soil | N/A | Partial Pass | Partial approval for the underground ABS sewer drain at the MBR, okay to shade fill and for concrete placement |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0525-02326
Permit Description: remove all old cast iron sewer piping and install new ABS piping
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2025 | COT - RSPL - Rough Soil | Passed | Approved underground sewer to existing sewer main, okay to backfill and for concrete placement in the home |