Permit: TC-RES-0525-02325
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2201 E HAMPTON ST UNIT 2
Address NEW:
2201 E HAMPTON ST UNIT 2
Apply Date:
05/01/2025
Applicant:
Aaron Skoczen
Description:
Alter Art Studio into ADU
Permit Reviews
Permit Number - TC-RES-0525-02325
Permit Status: Complete
Permit Description: Alter Art Studio into ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/02/2025 | RESIDENTIAL NEW DWELLING v.1 | 06/06/2025 | REQUIRES RESUBMIT |
| 06/11/2025 | RESIDENTIAL NEW DWELLING v.2 | 07/10/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0525-02325
Permit Status: Complete
Permit Description: Alter Art Studio into ADU
| Date | Description | Comments |
|---|---|---|
| 05/29/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 05/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0525-02325
Permite Description: Alter Art Studio into ADU
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0525-02325
Permit Description: Alter Art Studio into ADU
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2025 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading materials are required. 8/14/2025 | |
| 08/15/2025 | COT - RSPL - Rough Soil | Passed | 8.15.2025 Okay to proceed, shading material required. |
|
| 08/15/2025 | COT - RSPL - Sewer | Passed | 8.15.2025 Corrections made, okay to backfill with shading. |
|
| 08/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to,insulate and sheet rock throughout | |
| 11/05/2025 | RSBU - Building Final | Passed | ||
| 12/12/2025 | COT - RSEL - Electrical Final | Passed | ||
| 12/12/2025 | COT - RSME - Mechanical Final | Passed | ||
| 12/12/2025 | COT - RSPL - Plumbing Final | Passed |