Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0525-02309
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
2330 E MONTANA DR
Address NEW:
2330 E MONTANA DR
Apply Date:
05/01/2025
Applicant:
Gracie / Jozett Keena
Description:
Upgrade existing electrical panel to a 200amp all in one.
Permit Reviews
Permit Number - TC-RES-0525-02309
Permit Status: Complete
Permit Description: Upgrade existing electrical panel to a 200amp all in one.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/01/2025 | RESIDENTIAL SIMPLE REVIEW v.1 | 05/02/2025 | APPROVED |
Conditions
Permit Number - TC-RES-0525-02309
Permit Status: Complete
Permit Description: Upgrade existing electrical panel to a 200amp all in one.
| Date | Description | Comments |
|---|---|---|
| 05/01/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0525-02309
Permit Description: Upgrade existing electrical panel to a 200amp all in one.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/27/2025 | BULD - Electrical Clearance | Passed | 5/27/25: TEP INCR VERBAL CLEARANCE TO TEP AT 2:38pm. Ok to energize | |
| 05/28/2025 | COT - RSEL - Electrical Final | Passed | ||
| 05/28/2025 | RSBU - Building Final | Passed |