Permit: TC-RES-0524-03313
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
5215 E 6TH ST
Address NEW:
5215 E 6TH ST
Apply Date:
05/31/2024
Applicant:
Cesar Barra
Description:
Enclose Garage into Studio (Sleeping Quarters)
Permit Reviews
Permit Number - TC-RES-0524-03313
Permit Status: Inspections
Permit Description: Enclose Garage into Studio (Sleeping Quarters)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2024 | RESIDENTIAL NEW DWELLING v.3 | 10/28/2024 | APPROVED |
| 08/21/2024 | RESIDENTIAL NEW DWELLING v.2 | 09/17/2024 | REQUIRES RESUBMIT |
| 05/31/2024 | RESIDENTIAL NEW DWELLING v.1 | 06/28/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0524-03313
Permite Description: Enclose Garage into Studio (Sleeping Quarters)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | Disussed actual conditions, which do not match approved plans; directed customer to obtain revision. |
| 11/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 1-Install bolts at front wall sill plate per. code. 2-Need power for Water heater. 3-need receptacles at North wall per Code. 4-open sub panel for inspection. 5-Secure conduit above sub panel. 6=Provide neutral and separate it from ground. 7-Provide test for DWV. 8- Dry in front wall. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0524-03313
Permit Description: Enclose Garage into Studio (Sleeping Quarters)
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2024 | COT - RSPL - Rough Soil | Passed | ||
| 11/08/2024 | COT - RSPL - Sewer | Passed | ||
| 11/13/2024 | COT - RSBU - Preslab | Passed | ||
| 11/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/03/2025 | COT - RSPL - Plumbing Final | Passed |