Permit: TC-RES-0524-03302
Permit Details
Apply Date:
05/31/2024
Applicant:
Brenton Ingalls
Description:
Residential Addition/Alteration
Permit Reviews
Permit Number - TC-RES-0524-03302
Permit Status: Inspections
Permit Description: Residential Addition/Alteration
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/09/2024 | RESTAMP - RESIDENTIAL v.1 | 08/13/2024 | APPROVED |
07/12/2024 | RESIDENTIAL NEW DWELLING v.2 | 08/09/2024 | APPROVED |
05/31/2024 | RESIDENTIAL NEW DWELLING v.1 | 06/28/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0524-03302
Permit Status: Inspections
Permit Description: Residential Addition/Alteration
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
06/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-RES-0524-03302
Permit Status: Inspections
Permit Description: Residential Addition/Alteration
Date | Description | Comments |
---|---|---|
08/13/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0524-03302
Permit Description: Residential Addition/Alteration
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2024 | COT - RSBU - Preslab | Passed | Okay to pour concrete. | |
12/19/2024 | COT - RSBU - Roof Nailing | Passed | .12/19/24 pass, mailing is per schedule, blocking was added on north side where needed | |
12/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/20/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Hold downs and exterior walls nailed per plan 12/20/24 |