Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0524-03088
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
1229 E LINDEN ST
Apply Date:
05/22/2024
Applicant:
TFS Solar
Description:
Roof mount 7.48 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV subpanel, 40A PV breaker on 200A bus with 200A MCB (x2)
Permit Reviews
Permit Number - TC-RES-0524-03088
Permit Status: Inspections complete
Permit Description: Roof mount 7.48 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV subpanel, 40A PV breaker on 200A bus with 200A MCB (x2)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/22/2024 | RESIDENTIAL SOLAR v.1 | 06/18/2024 | APPROVED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0524-03088
Permit Description: Roof mount 7.48 kW DC photovoltaic solar system; 17 AC modules, 2 branches, PV subpanel, 40A PV breaker on 200A bus with 200A MCB (x2)
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/11/2024 | RSBU - Building Final | Passed | ||
07/11/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
07/11/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter |