Permit: TC-RES-0524-03004
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
601 W CALLE LERDO
Address NEW:
601 W CALLE LERDO
Apply Date:
05/16/2024
Applicant:
Maria Theran
Description:
NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 9.855 KW DC/7.830 KW AC MPU (N) 225A MAIN SERVICE PANEL, 240V (N) UTILITY DG METER SOCKET, 125A
Permit Reviews
Permit Number - TC-RES-0524-03004
Permit Status: Complete
Permit Description: NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 9.855 KW DC/7.830 KW AC
MPU (N) 225A MAIN SERVICE PANEL, 240V
(N) UTILITY DG METER SOCKET, 125A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/17/2024 | RESIDENTIAL SOLAR v.1 | 06/13/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0524-03004
Permite Description: NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 9.855 KW DC/7.830 KW AC
MPU (N) 225A MAIN SERVICE PANEL, 240V
(N) UTILITY DG METER SOCKET, 125A
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2024 | BULD - Electrical Clearance | N/A | Partial Pass | Partial pass. Verbal clearance to TEP INCR for MPU. 9/25/2024 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0524-03004
Permit Description: NEW PHOTOVOLTAIC ROOF MOUNTED SYSTEM - 9.855 KW DC/7.830 KW AC
MPU (N) 225A MAIN SERVICE PANEL, 240V
(N) UTILITY DG METER SOCKET, 125A
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2024 | BULD - Electrical Clearance | Passed | Approved - DGC Clearance to TEP is required for the solar meter | |
| 10/01/2024 | RSBU - Building Final | Passed | ||
| 10/01/2024 | COT - RSOL - Electrical Final Solar Project | Passed | ||
| 10/01/2024 | COT - RSOL - Grounding/Bonding Solar Project | Passed |