Permit: TC-RES-0524-02959
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
2020 E 7TH ST
Address NEW:
2020 E 7TH ST
Apply Date:
05/15/2024
Applicant:
Jeminah Van Handel
Description:
inground pool and spa construction in backyard
Permit Reviews
Permit Number - TC-RES-0524-02959
Permit Status: Inspections complete
Permit Description: inground pool and spa construction in backyard
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/27/2024 | RESIDENTIAL POOL v.3 | 07/02/2024 | APPROVED |
| 06/04/2024 | RESIDENTIAL POOL v.2 | 06/14/2024 | REQUIRES RESUBMIT |
| 05/21/2024 | RESIDENTIAL POOL v.1 | 05/21/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0524-02959
Permite Description: inground pool and spa construction in backyard
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2024 | Pool/Spa - Electric | N/A | Not Ready | Please cover all electrical conduits to a pool equipment |
| 10/03/2024 | RSBU - Building Final | N/A | Not Ready | Please secure uni strut to building in two location's and no open spaces are allowed on dead front |
| 10/03/2024 | COT - RSEL - Electrical Final | N/A | Not Ready | Please secure uni strut to building in two location's and no open spaces are allowed on dead front |
| 10/03/2024 | Pool/Spa - Plumbing | N/A | Not Ready | please complete plumbing and electrical installation pool equipment |
| 10/03/2024 | Pool/Spa - Final/Barrier | N/A | Partial Pass | please complete pavers fencing is to high as is |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0524-02959
Permit Description: inground pool and spa construction in backyard
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2024 | Pool/Spa - Bonding Grip | Passed | ||
| 08/16/2024 | RSEL - Electrical Progress | Passed | ||
| 08/13/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter connection | |
| 08/13/2024 | Pool/Spa - Pre-Gunite | Passed | ||
| 10/08/2024 | Pool/Spa - Electric | Passed | ||
| 10/08/2024 | RSBU - Building Final | Passed | ||
| 10/08/2024 | COT - RSEL - Electrical Final | Passed | ||
| 10/08/2024 | Pool/Spa - Plumbing | Passed | ||
| 10/08/2024 | Pool/Spa - Final/Barrier | Passed |