Permit: TC-RES-0523-05578
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
3031 E 2ND ST
Address NEW:
3031 E 2ND ST
Apply Date:
05/31/2023
Applicant:
Description:
Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN *whole home backup with backup switch installation which will require a power kill for completion
Permit Reviews
Permit Number - TC-RES-0523-05578
Permit Status: Inspections complete
Permit Description: Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN
*whole home backup with backup switch installation which will require a power kill for completion
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/14/2023 | RESIDENTIAL SOLAR v.1 | 07/05/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05578
Permite Description: Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN
*whole home backup with backup switch installation which will require a power kill for completion
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the Tesla meter switch, DGL Clearance was called into TEP at 11:00am |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05578
Permit Description: Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN
*whole home backup with backup switch installation which will require a power kill for completion
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/DGL/BAT clearance to TEP is required for the solar meter and battery | |
| 10/09/2023 | RSBU - Building Final | Passed | ||
| 10/09/2023 | COT - RSOL - Electrical Final Solar Project | Passed |