Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
3031 E 2ND ST
Address NEW:
3031 E 2ND ST
Apply Date:
05/31/2023
Applicant:
Description:
Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN *whole home backup with backup switch installation which will require a power kill for completion

Permit Reviews

Permit Number - TC-RES-0523-05578
Permit Status: Inspections complete
Permit Description: Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN *whole home backup with backup switch installation which will require a power kill for completion
Start Date Submittal Complete Date Status  
06/14/2023 RESIDENTIAL SOLAR v.1 07/05/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05578
Permite Description: Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN *whole home backup with backup switch installation which will require a power kill for completion
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/05/2023 BULD - Electrical Clearance N/A Partial Pass Partial for the Tesla meter switch, DGL Clearance was called into TEP at 11:00am

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-RES-0523-05578
Permit Description: Installation of a 10.80kW PV system with (01)TESLA POWERWALLS+ INTEGRATED SOLAR BATTERY SYSTEM (01)TESLA POWERWALL 2 BATTERY (09)TESLA SOLAR SHUTDOWN *whole home backup with backup switch installation which will require a power kill for completion
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/09/2023 BULD - Electrical Clearance Passed Approved, DGC/DGL/BAT clearance to TEP is required for the solar meter and battery
10/09/2023 RSBU - Building Final Passed
10/09/2023 COT - RSOL - Electrical Final Solar Project Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-JOHN DE LAIR_PLAN SET_REV05_06-30-2023_V1.PDF DOCUMENTS VIEW