Permit: TC-RES-0523-05549
Permit Details
Status:
Inspections
Type:
Residential Building - One or Two Family
Address:
2901 E ARROYO CHICO
Address NEW:
2901 E ARROYO CHICO
Apply Date:
05/30/2023
Applicant:
Daniel Simmons
Description:
Fire Damage Repair
Permit Reviews
Permit Number - TC-RES-0523-05549
Permit Status: Inspections
Permit Description: Fire Damage Repair
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/01/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/26/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-RES-0523-05549
Permite Description: Fire Damage Repair
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2023 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | Not ready. Missing h.25 clips at bearing points per detail 1 and 2 page #2. Add anchor bolts at load bearing walls. 6" form edges 48" o.c. Eave 6' tails do not have the proper spacing. As built. Check proper nailing for floating facia. 11/28/2023 |
| 05/23/2024 | COT - RSPL - Gas Pressure Test | N/A | Partial Pass | OK to cover |
| 02/25/2025 | RSPL - Plumbing Progress | N/A | Canceled | Canceled by contractor |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-RES-0523-05549
Permit Description: Fire Damage Repair
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 05/31/2024 | BULD - Electrical Clearance | Passed | Fire damage, OK to set for service upgrade | |
| 07/11/2024 | COT - BULD - SWG Clearance | Passed | ||
| 07/11/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/13/2025 | RSBU - Building Final | Passed | ||
| 06/13/2025 | COT - RSEL - Electrical Final | Passed | ||
| 06/13/2025 | COT - RSME - Mechanical Final | Passed | ||
| 06/13/2025 | COT - RSPL - Plumbing Final | Passed |