Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-RES-0523-05313
Permit Details
Apply Date:
05/19/2023
Applicant:
Alex Villanueva
Description:
Installation of solar panels on roof. Replace existing main service panel with 225/200A panel.
Permit Reviews
Permit Number - TC-RES-0523-05313
Permit Status: Complete
Permit Description: Installation of solar panels on roof. Replace existing main service panel with 225/200A panel.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
05/24/2023 | RESIDENTIAL SOLAR v.1 | 06/13/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05313
Permite Description: Installation of solar panels on roof. Replace existing main service panel with 225/200A panel.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2023 | BULD - Electrical Clearance | N/A | Partial Pass | Partial for the service upgrade, INCR Clearance was called into TEP at 11:00am (power-kill) |
Completed Inspections
Permit Status: Complete
Permit Number: TC-RES-0523-05313
Permit Description: Installation of solar panels on roof. Replace existing main service panel with 225/200A panel.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/03/2023 | BULD - Electrical Clearance | Passed | Approved, DGC Clearance to TEP is required for the solar meter | |
08/03/2023 | RSBU - Building Final | Passed | ||
08/03/2023 | COT - RSEL - Electrical Final | Passed |